Dreamsprojects.com is ranked #1,356,620 among the most popular web sites, the lower the rank indicator the more popular is the web site and the more visitors it has. Dreamsprojects.com is registered in 2008-10-13 owned by , website’s age 15 years, 6 months, 13 days years. The number of unique users visiting this website every day is 371. Each individual visits 1.0 unique pages per day. Approximate time spent on a web site 0:29. There are an average of 74 links pointing back to dreamsprojects.com from other websites. Dreamsprojects.com daily advertisement revenue is $7 USD. According to our analysis the approximate value of the website is $2,671 US Dollars. Most popular search engine request "online". Website’s IP address is 208.91.197.104 which is hosted by Confluence Networks, site server is located in Road Town 00 in Virgin Islands, British. Dreamsprojects.com reputation rank is 77 of 100. The web site is not listed in DMOZ open directory project.
Overview Information about Dreamsprojects.com | |
---|---|
Title | Dreamsprojects.com |
Alexa Rank | #1,356,620 |
Alexa Backlinks | 74 |
Estimated Daily Traffic | 371 visitors |
Estimated Daily Revenue | $7.42 USD |
Website Worth | $2,671.20 USD |
Domain Name | Dreamsprojects.com |
Domain Created | 2008-10-13 (15 years, 6 months, 13 days ago) |
Domain Expires | 2013-10-13 (in 10 years, 6 months, 13 days) |
Domain Registrar | BIGROCK SOLUTIONS LIMITED |
Domain Nameservers |
dns1.spark.parking-page.net (208.91.197.104) dns2.spark.parking-page.net (199.79.61.104) |
Yahoo Indexed | 1 pages |
Bing Indexed | 1 pages |
Server IPs | 208.91.197.104 |
Server Provider | Confluence Networks |
Server Location | Virgin Islands, British, Road Town |
Dreamsprojects.com is visited by around 371 unique visitors per day. Every visitor of this website viewing approximately 1.0 pages per day.
We found 74 backlinks to Dreamsprojects.com from other web sites. The largest number of backward links are 0, the smallest number of links are 0, the average number of links are 0 refer to this web site.
Using information from users, and other reliable sources, Dreamsprojects.com has the reputation 77 out of 100.
Main HTML elements that might affect on search engines ranking.
<H1> Tags: | 1 | <H2> Tags: | 1 |
---|---|---|---|
<H3> Tags: | 4 | <H4> Tags: | 25 |
<H5> Tags: | 5 | <H6> Tags: | 1 |
IFrames: | 0 | Flash: | No |
Total Links: | 87 | Total Images: | 8 |
Language: | Catalan | Text/Html Ratio: | 2.65% |
Doctype: | Yes | Microformats: | Not found |
Meta | Content |
---|---|
content-type | text/html; charset=UTF-8 |
refresh | 0;url=http://ww2.dreamsprojects.com/rg-erdr.php?p=J1c4gcNvvUVf4W1FboFgXo%3D9%7C%40%7CbGtzbT%7C%40%7C4Nf1V9gNv%3DfJ59.JvV%7C%40%7CfB%7C%40%7C%7C%40%7CzHzEGGHFT%7C%40%7CZGEtt%7C%40%7CMR&ga=aYgT3CNqpnzCQYcp2Efxraczo1k4wNJAu9hgxkh49ynjludTwEUMs%2FmTarbjvNHFQ4pFcwOVPgRgFJDIMghn8C3Dnu8VhuTDVkrTXL53K2Cx6Rizrk6xhB7RfFQHkV1qgJq7b%2BpGP2Y2PWIOLGFKrBFUyKps3WxxnvmW7esqsEriYurbsBFGBmzPoCs5WPyD&t=gnojs |
The top queries driving traffic to Dreamsprojects.com from search engines.
Query | Search Traffic |
---|---|
the avengers (2012) - hdcam | 3.07% |
wena naty online | 2.74% |
ver batman: year one online audio latino | 2.10% |
bajar musica gratis de roberto carlos | 1.89% |
mas chileno que | 1.78% |
english vocabulary premium ii | 1.78% |
makarena venegas | 1.78% |
fotos prohibidas de anita alvarado 2011 | 1.78% |
happy feet 1 la pelicula | 1.78% |
happy feet 1 pelicula | 1.78% |
High impact keywords that attract search engine traffic.
Detailed information about the server that hosts Dreamsprojects.com
Server IPs: | 208.91.197.104 |
---|---|
Server Name: | Apache/2.2.3 (Red Hat) |
Server Provider: | Confluence Networks |
Server Location: | Road Town 0 in Virgin Islands, British |
Charset: | UTF-8 |
Powered By: | PHP/5.3.21 |
Server located: Road Town 0 in Virgin Islands, British
The IP address of Dreamsprojects.com is 208.91.197.104.
From the HTTP headers of Dreamsprojects.com, you will know that HTTP status code is HTTP/1.1 200 OK, server name is Apache/2.2.3 (Red Hat).
HTTP/1.1 200 OK |
Date : Fri, 01 Mar 2013 01:24:30 GMT |
Server : Apache/2.2.3 (Red Hat) |
X-Powered-By : PHP/5.3.21 |
Set-Cookie : gvc=902vr1096466706204740; expires=Wed, 28-Feb-2018 01:24:30 GMT; path=/; domain=ww2.dreamsprojects.com; httponly |
Cache-Control : no-store, no-cache, must-revalidate, post-check=0, pre-check=0 |
Pragma : no-cache |
Vary : Accept-Encoding,User-Agent |
Content-Encoding : gzip |
Content-Length : 15996 |
Content-Type : text/html; charset=UTF-8 |
The ratio of outbound links to inbound links influences the distribution of the weight of a website as a whole.
The chart shows how Dreamsprojects.com indexed in major search engines.
PageRank™ is a link analysis algorithm used by Google™.
Google™ assigned this website a Pagerank of 0. The maximum value is 0, the minimum value is 0, while the average value is 0.
The W3C Markup Validation Service is a validator by the World Wide Web Consortium (W3C), which allows Internet users to check HTML and XHTML documents for well-formed markup.
Links (even if they have nofollow attributes) from major social networks is a "human" signal for search engines, which has some influence (non-determining influence) on the position of your website in search results.